 |
< The
final lift support is lifted into position |
 |
Preparing
to top the lift > |
 |
| Part of the
brake run in place > |
 |
^ A
promotional poster from the front gate |
 |
< The
final lift section waits to be hoisted |
 |
< Poster
from the construction wall |
 |
Poster from
the construction wall > |
 |
| Nice
looking turn > |
 |
^ Workers
secure the supports |
 |
< Going
up |
 |
<
SheiKra will cut through the roof of the Smokehouse |
 |
A close
pass to the tower > |
 |
| Passing
over the entrance > |
 |
^ looking
up inside the tower |
 |
<
Standing straight |
 |
<
Transfer track |
 |
The brakes
and station area > |
 |
| Unwrapping
the slings > |
 |
^ It's a
steep lift |
 |
<
Reaching for the sky |