 |
 |
 |
| Hydra Trains in winter rehab |
 |
Maintenance
Shop |
 |
| Steel Force trains |
|
New brass bushings for Hydra |
 |

Coaster wheels are
everywhere you look! |
 |
| |
|
 |
 |
| |
|
|
 |
 |
 |
| One of the umbrella rides is being
rewired this winter |
Prop from Halloween |
 |
 |
 |
| |
|
|
 |
 |
 |
| The sign shop has some classic signs and
props on display |
 |
Sign
Shop |
 |
| |
|
Lazer's sign is getting rehabbed |
 |
 |
 |
| Plan for the new Voodoo sign |
Mockup of the Voodoo sign
3-dimensional logo |
A new lapbar straight from Intamin
ready for Voodoo |
 |

Seats from the former Superman Ultimate
Escape/Steel Venom, being replaced with purple ones. These will be
auctioned at EastCoaster on Saturday.
Voodoo |
 |
| The Voodoo sign base |
Some of the LIM fins |
 |
 |
 |
| Drawing of Voodoo |
The track end stoppers for Voodoo |
 |
 |
 |
| One of the umbrella rides being
rehabbed |
The Voodoo construction site |
 |
Voodoo
Site
 |
 |
| Lots of freshly painted parts
waiting to be assembled |
The electrical building is taking
shape quickly |
 |
 |
| Footers are in place and waiting
for the steel to go up |
The electrical building looks nearly
completed |
The ACErs tour the park in the
pouring rain |