|
|
|
Hydra Trains in winter rehab |
|
Maintenance
Shop |
|
Steel Force trains |
|
New brass bushings for Hydra |
|
Coaster wheels are
everywhere you look! |
|
|
|
|
|
|
|
|
|
|
|
One of the umbrella rides is being
rewired this winter |
Prop from Halloween |
|
|
|
|
|
|
|
|
|
The sign shop has some classic signs and
props on display |
|
Sign
Shop |
|
|
|
Lazer's sign is getting rehabbed |
|
|
|
Plan for the new Voodoo sign |
Mockup of the Voodoo sign
3-dimensional logo |
A new lapbar straight from Intamin
ready for Voodoo |
|
Seats from the former Superman Ultimate
Escape/Steel Venom, being replaced with purple ones. These will be
auctioned at EastCoaster on Saturday.
Voodoo |
|
The Voodoo sign base |
Some of the LIM fins |
|
|
|
Drawing of Voodoo |
The track end stoppers for Voodoo |
|
|
|
One of the umbrella rides being
rehabbed |
The Voodoo construction site |
|
Voodoo
Site
|
|
Lots of freshly painted parts
waiting to be assembled |
The electrical building is taking
shape quickly |
|
|
Footers are in place and waiting
for the steel to go up |
The electrical building looks nearly
completed |
The ACErs tour the park in the
pouring rain |